23 December 2021

Dam of Ca'Zul (PN)

Client: Edison

Rehabilitation of the discharge organs of the Ca 'Zul Dam.

It is a double arch barrier over 70m high. Through controlled demolition, the spillway and the bridge at the top were eliminated and rebuilt, increasing the overflow capacity.

For the realization of all the works, a tower crane with a 50m arm was mounted, anchored to a steel platform specially designed to work cantilevered on the crown of the dam.